OUR Partners

A&P Development and Construction mta bus operations project

 

This project consisted of installing three major structural canopies sequentially as to not impact the existing bus facility, A&P continued to work in adverse conditions and keep the project on track. Structural changes were directed requiring installation of structural caissons well in to the water table. A&P operated in very tight conditions to deliver the project with minimal impact to the project cost while completing the project within the original contract schedule. Teaming with the MTA they furnished hazardous material handlers to assist on the site during excavation. Vacuum trucks were provided by the MTA to remove the water during caissons drilling prior to having our crews pour the structural caissons. This dramatically reduced the cost to the MTA while executing major contract changes.

Fully furnished double decker offices were installed in the mechanics bay areas with temporary facilities supplied to help facilitate the move. Modified supply and exhaust systems were installed with booster fans to help pull outside air into the modular offices along with the extension of the existing CNG detection system in to the new office area. With the help and assistants of Robnett Electric we were able to make modifications to the existing CNG detection and electrical systems successfully without availability of as built drawings.

A&P is pleased to have the opportunity to work with MTA, and looks forward to creating more successful projects in the future.

For further information, please see the photos below.

 


MTA Structural Canopies

 

 

MTA Structural Canopies  

MTA Structural Canopies  

 

 


Copyright 2008©

A&P Development and Construction

Site Designed by The Extreme Consultant